Image 1 of 1

cul_TU_84.tif

Download
Trout Unlimited: Concrete box culverts are staged on the bank of Lane's Creek, Idaho, in the spring of 2014 as part of a Trout Unlimited project to replace two old corrugated metal culverts that impede the migration of Yellowstone cutthroat trout to their historic spawinng areas. The box culverts are scheduled to be installed at the end of May 2014.
Copyright
James Nelson/MtnSportsPhoto.com
Image Size
4288x2848 / 35.0MB
MtnSportsPhoto.com
Contained in galleries
Trout Unlimited: Concrete box culverts are staged on the bank of Lane's Creek, Idaho, in the spring of 2014 as part of a Trout Unlimited project to replace two old corrugated metal culverts that impede the migration of Yellowstone cutthroat trout to their historic spawinng areas. The box culverts are scheduled to be installed at the end of May 2014.